Flight MH370/2014-03-08/02-27-03 MYT: Difference between revisions

MH370 DECODED
Jump to navigation Jump to search
m Text replacement - "{{Day " to "{{Day:"
m GrantM moved page Timeline/2014-03-08/02-27-03 MYT to MH370 Chronology/2014-03-08/02-27-03 MYT without leaving a redirect
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
[[Category:Andaman Sea to North Indian Ocean]]
[[Category:Andaman Sea to North Indian Ocean]]
{{ TimelineDetailsPage
{{ TimelineDetailsPage
     |Day={{Day:001}}
     |Day={{Day:1}}
     |Time={{Time:{{SUBPAGENAME}}/EventTime}}
     |Time={{Time:{{FULLPAGENAME}}/EventTime}}
     |EventType={{Time:{{SUBPAGENAME}}/EventType}}
     |EventType={{Time:{{FULLPAGENAME}}/EventType}}
     |Summary={{Time:{{SUBPAGENAME}}/Summary}}
     |Summary={{Time:{{FULLPAGENAME}}/Summary}}
     |EventDetails={{Time:{{SUBPAGENAME}}/Details}}
     |EventDetails={{Time:{{FULLPAGENAME}}/Details}}
     |Notes={{Time:{{SUBPAGENAME}}/Notes}}  
     |Notes={{Time:{{FULLPAGENAME}}/Notes}}  
     |ReturnToTimelineLink=<html><a href="/Timeline/ANDS-NIO#022703" class="nav-btn return">Return to Timeline</a></html>
     |ReturnToTimelineLink=<html><a href="/Timeline/ANDS-NIO#022703" class="nav-btn return">Return to Timeline</a></html>
}}
}}

Revision as of 07:49, 3 August 2026

Event Summary

02:27:03 MYT Saturday 08 March 2014

Return to Timeline

The IFE sets up a Data-3 ground connection (X.25 circuit) over SATCOM for an SMS/e-mail application after the SATCOM link is re-established.


Event Details

  1. Safety Investigation Report MH370/01/2018 Satellite Ground Station Logs - Key Observations

    The IFE sets up a Data-3 ground connection (X.25 circuit) over SATCOM for an SMS/e-mail application after the SATCOM link is re-established.



Notes